Integration can be launched/scheduled through the Launch/Schedule Integration Task.
Select the integration that needs to be selected in the Integration field and the scheduling detail on Run Frequency.
In case of an EIB/ inbound file upload the file in the field Integration Attachment.
If the integration needs to be run only in validation mode select the checkbox for Validation Only Load field. To provide the schedule detail select the tab Schedule to give the details as required.
Select the integration that needs to be selected in the Integration field and the scheduling detail on Run Frequency.
In case of an EIB/ inbound file upload the file in the field Integration Attachment.
If the integration needs to be run only in validation mode select the checkbox for Validation Only Load field. To provide the schedule detail select the tab Schedule to give the details as required.